Post-frame gable wall with a white window set in the framing and dark roof metal along the top edge.

Pole Barns

Pole Building with Windows

May 2026 · 2 photos

Framed building with set windows; roof metal going on.

These photos were taken on May 12. The post frame was up and the girts were on. We framed openings between the girts and set the windows right into the wall framing, before any wall metal went on.

Up top, the roof metal was going on. Ladders lined the long side so the crew could work the eave edge. This is the stage where a pole building starts to look like a building.

The build, start to finish

  1. Window set between the girts
    Window set between the girtsMay 12, 2026
  2. Ladders along the eave for roof work
    Ladders along the eave for roof workMay 12, 2026