Posts, framing, decking, stairs and black metal railings around the pool.
We started this pool deck on May 4 by setting posts around the above-ground pool. Beams went across the posts and the joists followed, with the framing shaped to the round edge of the pool.
Decking started going down on May 5. Each board along the pool was cut to follow the curve, so the deck meets the pool edge cleanly. On May 7 we set the stair stringers at the edge of the deck.
From May 8 to May 10 we built out the stairs and installed black metal railings around the deck and down the stairs. The finished deck wraps the pool with a set of stairs down to the yard.
The build, start to finish

Posts going in around the poolMay 4, 2026 
May 4, 2026 
May 4, 2026 
Beams and joists framed along the poolMay 4, 2026 
May 5, 2026 
Decking going down over the joistsMay 6, 2026 
May 6, 2026 
Decking cut to the curve of the poolMay 6, 2026 
May 7, 2026 
May 7, 2026 
Stairs and first railings going onMay 8, 2026 
May 8, 2026 
Finished stairs and black metal railingsMay 10, 2026 
May 10, 2026 
May 10, 2026 
May 10, 2026